Approved Document E
The first set of national building standards was introduced in 1965. Now known as the building regulations, they set out:
- What qualifies as 'building work' and so fall under the control of the regulations.
- What types of buildings are exempt.
- The notification procedures that must be followed when starting, carrying out, and completing building work.
- Requirements for specific aspects of building design and construction.
The 'approved documents' provide guidance for how the building regulations can be satisfied in common building situations. There is no obligation to adopt the solutions presented in the approved documents, the building regulations can be satisfied in other ways.
Approved Document E: Resistance to the passage of sound, was last published in 2015.
It deals with requirements for sound insulation in buildings, including both new dwellings and the conversion of buildings to form dwellings. It covers sound reduction between rooms for residential purposes and designated rooms in dwellings, and acoustic conditions for common areas in flats and schools.
The content of the Approved Document includes:
- Section 0: Performance standards.
- Section 1: Pre-completion testing – Provides guidance on an appropriate programme of sound insulation testing for a sample of properties. See Pre-completion sound testing.
- Section 2: Separating walls and associated flanking constructions for new buildings – Provides examples of wall types and their junction requirements.
- Section 3: Separating floors and associated flanking constructions for new buildings – Provides examples of floor types and their junction requirements.
- Section 4: Dwelling-houses and flats formed by material change of use – Includes guidance on work to existing construction, corridor walls and doors, wall, stair and floor treatments, junction requirements .
- Section 5: Internal walls and floors for new buildings – Includes guidance on doors, layout, and junction requirements
- Section 6: Rooms for residential purposes.
- Section 7: Reverberation in the common internal parts of buildings containing flats or rooms for residential purposes.
- Section 8: Acoustic conditions in schools.
- Annex A: Method for calculating mass per unit area.
- Annex B: Procedures for sound insulation testing.
- Annex C: Glossary.
- Annex D: References.
- Annex E: Design details.
[edit] Related articles on Designing Buildings Wiki
- Airborne sound.
- Approved documents.
- Approved Document A.
- Building acoustics.
- Building Regulations.
- Decibel.
- Noise nuisance.
- Part E compliance.
- Pre-completion sound testing.
- Reverberation.
- Robust details certification scheme.
- Room acoustics.
- Sound absorption.
- Sound absorption coefficient.
- Sound frequency.
- Sound insulation in buildings.
- Sound insulation in dwellings: Part 1: An introduction (GG 83-1).
- Sound v noise.
- Structure-borne sound.
Featured articles and news
Tackle the decline in Welsh electrical apprenticeships
ECA calls on political parties 100 days to the Senedd elections.
Resident engagement as the key to successful retrofits
Retrofit is about people, not just buildings, from early starts to beyond handover.
What they are, how they work and why they are popular in many countries.
Plastic, recycling and its symbol
Student competition winning, M.C.Esher inspired Möbius strip design symbolising continuity within a finite entity.
Do you take the lead in a circular construction economy?
Help us develop and expand this wiki as a resource for academia and industry alike.
Warm Homes Plan Workforce Taskforce
Risks of undermining UK’s energy transition due to lack of electrotechnical industry representation, says ECA.
Cost Optimal Domestic Electrification CODE
Modelling retrofits only on costs that directly impact the consumer: upfront cost of equipment, energy costs and maintenance costs.
The Warm Homes Plan details released
What's new and what is not, with industry reactions.
Could AI and VR cause an increase the value of heritage?
The Orange book: 2026 Amendment 4 to BS 7671:2018
ECA welcomes IET and BSI content sign off.
How neural technologies could transform the design future
Enhancing legacy parametric engines, offering novel ways to explore solutions and generate geometry.
Key AI related terms to be aware of
With explanations from the UK government and other bodies.
From QS to further education teacher
Applying real world skills with the next generation.
A guide on how children can use LEGO to mirror real engineering processes.
Data infrastructure for next-generation materials science
Research Data Express to automate data processing and create AI-ready datasets for materials research.
Wired for the Future with ECA; powering skills and progress
ECA South Wales Business Day 2025, a day to remember.
AI for the conservation professional
A level of sophistication previously reserved for science fiction.






















